4 Beds
3 Baths
2,982 SqFt
4 Beds
3 Baths
2,982 SqFt
OPEN HOUSE
Sun Aug 10, 12:00pm - 2:30pm
Key Details
Property Type Single Family Home
Sub Type Detached
Listing Status Active
Purchase Type For Sale
Square Footage 2,982 sqft
Price per Sqft $187
Subdivision Hazel Farm
MLS Listing ID DEKT2039370
Style Colonial
Bedrooms 4
Full Baths 2
Half Baths 1
HOA Fees $12/qua
HOA Y/N Y
Abv Grd Liv Area 2,982
Year Built 2010
Available Date 2025-08-01
Annual Tax Amount $2,436
Tax Year 2024
Lot Size 0.341 Acres
Acres 0.34
Lot Dimensions 87.41 x 170.60
Property Sub-Type Detached
Source BRIGHT
Property Description
Step inside to gleaming hardwood floors that run seamlessly throughout the entire home. The main level features a private office, a formal dining room with crown molding, and a large living room anchored by a cozy gas fireplace. The chef's kitchen is a true centerpiece with a center island, abundant cabinetry, and a bright morning room that leads out to an expansive white deck.
Upstairs, you'll find four generously sized bedrooms, including a luxurious primary suite with a lighted tray ceiling, walk-in closet, and a spa-inspired ensuite bath featuring a jetted soaking tub, separate tiled shower, and dual vanities. The hallway bath is perfect for family or guests, and crown molding continues throughout, adding a touch of sophistication in every room.
The fully carpeted basement offers additional living space and includes a rough-in for a half bath—perfect for future expansion. An attached two-car garage adds convenience and ample storage.
Step outside to your private retreat: a stunning white deck with a pergola, a screened gazebo, and a sunken hot tub (non-working, but ready for restoration) that brings resort-style living right to your backyard, which backs to the woods with a pond view. The lush yard is supported by a sprinkler system, and the home comes equipped with owned solar panels and a whole-house water filtration system for added efficiency and peace of mind.
This one-of-a-kind home has it all—space, style, and standout features both inside and out.
Don't miss your chance to own this exceptional property—schedule your private showing today!
Location
State DE
County Kent
Area Capital (30802)
Zoning RS1
Rooms
Other Rooms Living Room, Dining Room, Primary Bedroom, Bedroom 2, Bedroom 3, Bedroom 4, Kitchen, Family Room, Foyer, Breakfast Room, Exercise Room, Laundry, Office, Bathroom 1, Bathroom 2, Half Bath
Basement Fully Finished, Heated, Full, Sump Pump, Water Proofing System, Windows
Interior
Interior Features Bathroom - Jetted Tub, Bathroom - Tub Shower, Breakfast Area, Carpet, Ceiling Fan(s), Crown Moldings, Dining Area, Family Room Off Kitchen, Floor Plan - Traditional, Formal/Separate Dining Room, Kitchen - Gourmet, Kitchen - Island, Pantry, Primary Bath(s), Recessed Lighting, Sprinkler System, Store/Office, Upgraded Countertops, Walk-in Closet(s), Water Treat System, Window Treatments, Wood Floors
Hot Water 60+ Gallon Tank
Heating Solar - Active, Forced Air
Cooling Central A/C
Flooring Hardwood
Equipment Built-In Microwave, Cooktop, Dishwasher, Disposal, Dryer - Electric, Exhaust Fan, Humidifier, Microwave
Furnishings No
Fireplace N
Appliance Built-In Microwave, Cooktop, Dishwasher, Disposal, Dryer - Electric, Exhaust Fan, Humidifier, Microwave
Heat Source Natural Gas
Laundry Main Floor
Exterior
Parking Features Garage - Front Entry, Garage Door Opener
Garage Spaces 6.0
Utilities Available Cable TV
Amenities Available Pool - Outdoor, Fitness Center
Water Access N
View Pond, Trees/Woods
Roof Type Architectural Shingle
Street Surface Black Top
Accessibility 32\"+ wide Doors
Attached Garage 2
Total Parking Spaces 6
Garage Y
Building
Lot Description Adjoins - Open Space, Backs to Trees, Cul-de-sac, Pond, Rear Yard, SideYard(s)
Story 2
Foundation Block
Sewer Public Sewer
Water Public
Architectural Style Colonial
Level or Stories 2
Additional Building Above Grade, Below Grade
Structure Type 9'+ Ceilings,Cathedral Ceilings,Dry Wall,Tray Ceilings
New Construction N
Schools
Elementary Schools Towne Point
Middle Schools Central
High Schools Dover
School District Capital
Others
Pets Allowed Y
HOA Fee Include Common Area Maintenance,Management,Pool(s)
Senior Community No
Tax ID LC-00-03704-07-7400-000
Ownership Fee Simple
SqFt Source Assessor
Security Features Motion Detectors,Smoke Detector
Acceptable Financing Cash, Conventional, FHA, VA
Listing Terms Cash, Conventional, FHA, VA
Financing Cash,Conventional,FHA,VA
Special Listing Condition Standard
Pets Allowed No Pet Restrictions
Virtual Tour https://mylistings.tylersmileyphotography.com/vd/202727606

GET MORE INFORMATION
REALTOR® | Lic# 5001684